Timber Frame2018-11-04T14:04:34+00:00

Project Description

6-storey timber frame building. RWP connected to a hopper. No provision for structural movement in the drainage design. As the timber frame has settled down the RWP has ‘kinked’. This has snapped the top few clips and left about 6LM of RWP unsupported. Other movement related issued with the cladding panels.